Hi Vivek,
If you do not want to plan then Maintain MRP Type as ND for the material in material master MRP1 View. Then system will exclude such materials in MRP.
Thanks & Regards,
Ramagiri
Hi Vivek,
If you do not want to plan then Maintain MRP Type as ND for the material in material master MRP1 View. Then system will exclude such materials in MRP.
Thanks & Regards,
Ramagiri