Dear Gurus,
Need a suggestion on mapping or configuring the scenario:
Example:
Current process:
Two plants say 1000 and 1001 are there and for the initial say raw-materials (A&B) will be in procured in 1000 plant and in plant these two materials will be consumed to produce C material fert material.
For this we are going with STO concept doing transfer posting for raw materials in 1000 plant to 1001 production. Here is the situation like user doing the wrong postings:
To control this we thought to do: At the time of production order creation it self we need to do the consumption of raw materials should also be done is it possible to do with out maintaining the inventory in production plant, we can consume the raw materials from planning plant in 1000.
Need suggestions on this or if any configured required pls suggest how to on ASAP basis.
Thanks & Regards,