I run KO88, it says error: order must DLV or TECO, so in KO88, it didn't post to WIP FI side.
so I set order from REL to teco, in KO88, it post to production variance in stead of WIP.. which is wrong
if no accounting document generated, how can I verify WIP calculation and variance calculation has been performed?
instead of run WIP in three period, I incidently run WIP calculation three times in same period, how to correct error since accumlated WIP now is 1000*3=3000 for period 11, my WIP is 1000